PA/04550/23: sanction Class 4D kitchen flue in San Pawl il-Bahar
Chaplin's Pub Diner & Pizzeria, Triq il-Luzzu, Qawra, San Pawl il-Bahar
To sanction Class 4D kitchen flue.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- Chaplin's Pub Diner & Pizzeria, Triq il-Luzzu, Qawra, San Pawl il-Bahar
- Locality
- San Pawl il-Bahar
- Applicant
- AX Hotels Operations plc. Attn: Ms Denise Micallef Xuereb
- Perit
- Perit Jingyao Xu
- Application type
- Full development permission - Summary Process
- Zone
- Within Development Zone
- Type of works
- Sanctioning
- Received
- 30 March 2023
- Validated
- 28 September 2023
- Published
- 2 August 2023
- Comments close
- 1 September 2023
- Decision
- Acceptable
- Permit expires
- 18 October 2028
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Chaplin's Pub Diner & Pizzeria, Triq il-Luzzu, Qawra, San Pawl il-Bahar
81 other applications within 300 m: 61 granted, 1 refused, 3 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 11 floors (PA/02964/23).
On Triq il-Luzzu: 11 other applications, 9 granted and 0 refused; granted buildings are typically 7 floors, the tallest 7. Periti active on this street: architecture 360, Michael Camilleri, Matthew Psaila.
Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 22 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/01657/22 San Pawl il-Bahar: Demolition of existing boathouse and construction of Class 4D restaurant at ground floor level and overlying 5 apartments and 1 duplex penthouse.
- PA/05727/24 San Pawl il-Bahar: Increase in site extents further to PA/01657/22 and change of use at ground floor level from Class 4D to Class 1 garages for private cars. Demolition and…
- PA/01718/24 San Pawl il-Bahar: Renewal of PA/0059/19 for the proposed development including internal alterations and construction of additional floors.
- PA/00668/23 San Pawl il-Bahar: Repairs and realignment of an existing deteriorated slipway. This intervention will also consist of the resurfacing of the existing slipway with an anti-slip…
- PA/07485/23 San Pawl il-Bahar: Proposed alterations to an existing Class 4D outlet approved in RG 764/22, to change the front and rear part of the Class 4D outlet at ground floor level into…
- PA/04917/24 San Pawl il-Bahar: To demolish existing building, excavate for basement parking level and construct 8 floors building consisting a total of 2 maisonettes and 13 apartments.
- PA/02692/26 San Pawl il-Bahar: To convert existing apartment into maisonette, including minor external alterations. To include a parking space within a paved area. To reduce existing waste…
- PA/02784/26 San Pawl il-Bahar: To change the use of 7 approved shops (Class 4B) in PA/3875/21, to Class 1 residential units and Class 4A. Proposal includes minor internal and external…
- PA/06654/25 San Pawl il-Bahar: To make minor internal and external alterations to existing approved shops. Proposal includes the formation of a Class 4A office.
- PA/05400/25 San Pawl il-Bahar: To change the use of an existing Class 4B shop (commercial) into a Class 3C (assembly and leisure) commercial outlet including minor internal alterations.
- PA/01862/25 San Pawl il-Bahar: Proposed change of use from approved garage no.127, as per PA/10797/17 to public service garage.
- PA/00959/23 San Pawl il-Bahar: Change of use of approved Class 4B commercial to Class 1 residential units (12 in total).
- PA/07775/25 San Pawl il-Bahar: To change use of existing, basement level -2, domestic garage to a public service garage (for garaging of 'Y-plate' vehicles).
- PA/05404/25 San Pawl il-Bahar: To change the use of an existing Class 4B commercial approved in PA/10797/17 to a Class 4C commercial outlet including minor internal and external…
- PA/06350/25 San Pawl il-Bahar: Minor external alteration which included repositioning of glass railing at roof level (block D, penthouse 1) having a different layout from PA10797/17.
More by Jingyao Xu
- PA/06678/26 Naxxar: Rehabilitation of a pre-1968 dwelling, including the formation of a garage and internal alterations at ground-floor level, alterations at first-floor level,…
- PA/00550/26 Rabat: Change of use from shop Class 4B to garage; alterations to include the removal of shop signage, removal of internal temporary partitions, and an enlargement…
- PA/00462/26 Attard: Proposed change of use of garage to Class 4B shop, installation of sign and formation of bathroom using non-structural lightweight partitions.
- PA/06437/25 Mellieha: Proposal for the demolition of an existing residential unit and the construction of a new detached residential unit which includes an indoor pool, two outdoor…
- PA/06113/25 Sliema: To propose internal and external alterations, including the demolition of the existing washroom, to be replaced with the construction of a new washroom level,…
- PA/04573/25 Sliema: Proposed minor alterations to the existing building as a single dwelling (Class 1), including the demolition of the existing washroom, and construction of an…
All applications by Jingyao Xu
More from AX Hotels Operations plc
- PA/04250/25 San Pawl il-Bahar: To sanction the installation of two generators, each with associated fuel tank.
- PA/07283/24 San Pawl il-Bahar: Proposed variations (as existing and approved) from the official building alignments and front garden alignments in line with circular 1/24.
- PA/06560/24 San Pawl il-Bahar: To sanction variations to approved ODYCY lido (PA/06179/21) including variation of approved profile to cover services at roof level, demountable shading…
- PA/04653/24 San Pawl il-Bahar: Proposed installation of photovoltaic panels behind a perimeter screen and sanctioning of existing services at roof level.
- PA/01502/24 San Pawl il-Bahar: To sanction steps and ramp providing non-vehicular access to service corridor at basement level of the AX ODYCY hotel as built in 1986 (part missing in the…