propertylist

PA/01128/21: Demolition of existing washrooms at fifth floor in San Pawl il-Bahar

Costa Azzurra, Triq Emanuele Pinto, San Pawl il-Bahar

Demolition of existing washrooms at fifth floor level, Construction of apartment at fifth floor and receeded unit at sixth floor.

Status
Status being checked
Location
Costa Azzurra, Triq Emanuele Pinto, San Pawl il-Bahar
Locality
San Pawl il-Bahar
Applicant
Mr Carmel Gatt
Perit
Perit Pierre Poulton
Type of works
Demolition & New Construction (Residential)
Height
6 floors plus a receded floor
Residential units
2

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Costa Azzurra, Triq Emanuele Pinto, San Pawl il-Bahar

121 other applications within 300 m: 67 granted, 7 refused, 17 pending. 91% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/05349/23).

On Triq Emanuele Pinto: 6 other applications, 3 granted and 0 refused; granted buildings are typically 6 floors, the tallest 6.

Approval estimate for demolition & new construction applications like this here: about 91% (likely range 61–100%, low reliability, from 9 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Pierre Poulton

All applications by Pierre Poulton

More from Carmel Gatt

All planning applications in San Pawl il-Bahar