PA/03834/26: demolition of existing garages in San Pawl il-Bahar

Infill Site, Triq Emanuele Pinto, San Pawl il-Bahar

Proposed demolition of existing garages, excavation for basement level and reservoir, and construction of a Class 3B (3 star hotel bed and breakfast) including basement garage, 53 guests rooms and ancillary facilities including pool and restaurant /breakfast area over 10 floors (including basement garage) and installation of sign.

Status
Withdrawn (This application for development permission has been withdrawn by the applicant.)
Location
Infill Site, Triq Emanuele Pinto, San Pawl il-Bahar
Locality
San Pawl il-Bahar
Applicant
Solcity Malta Limited Attn: Charlot Abela
Perit
Perit Matthew Gauci
Application type
Full development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction (Commercial)
Height
10 floors
Residential units
53
Received
16 April 2026
Validated
10 June 2026
Published
10 June 2026
Comments close
10 July 2026

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Infill Site, Triq Emanuele Pinto, San Pawl il-Bahar

121 other applications within 300 m: 67 granted, 7 refused, 17 pending. 91% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/05349/23).

On Triq Emanuele Pinto: 6 other applications, 3 granted and 0 refused; granted buildings are typically 6 floors, the tallest 6.

Approval estimate for demolition & new construction applications like this here: about 77% (likely range 47–100%, low reliability, from 9 comparable decisions nearby). It proposes 10 floors; the tallest granted nearby is 8. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.