PA/01236/20: Rehabilitation of existing dwelling in Zebbug
Santorini, Triq Paris, Sqaq Nru. 2, Zebbug
Rehabilitation of existing dwelling (Class 1 (b)), inclusive of demolition of internal walls & staircase, and proposed internal alterations and extension at washroom level. - Site corrected by: PA/00105/23
- Status
- Status being checked
- Location
- Santorini, Triq Paris, Sqaq Nru. 2, Zebbug
- Locality
- Zebbug
- Applicant
- Jamar Malta Ltd Attn: Mr Jason Mifsud
- Perit
- JLZ+MBF Architects Architects
- Type of works
- Restoration
- Residential units
- 1
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Santorini, Triq Paris, Sqaq Nru. 2, Zebbug
153 other applications within 300 m: 92 granted, 2 refused, 15 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/03985/24).
On Triq Paris: 21 other applications, 13 granted and 1 refused; granted buildings are typically 3 floors, the tallest 3. Periti active on this street: Henry Attard, X,Y,Z Architecture & Design, David Borg.
Approval estimate for restoration applications like this here: about 95% (likely range 65–100%, low reliability, from 7 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/06902/26 Zebbug: Proposed alterations and extension to existing dwelling. Proposal also includes changes to the facade including the opening of a new aperture.
- PA/07099/23 Zebbug: Application includes minor internal alterations and extensions at ground, first and second floor level.
- PA/00666/23 Zebbug: To sanction minor changes to plans and facade apertures from those approved in PA05888/09.
- PA/03955/23 Zebbug: To sanction property as built from PA10249/17.
- PA/05771/25 Zebbug: Proposed internal and external alterations and construction of receded second floor level and overlying 1m parapet wall; demolition of stairwell and…
- PA/05935/26 Zebbug: Minor internal and external alteration including minor shifting of doors, walls and windows, minor extension at second floor level and proposed pool at roof…
- PA/03469/23 Zebbug: Proposed sanctioning of accretions to the back of a pre-1968 property.
- PA/03668/24 Zebbug: To demolish existing building (retaining facade), excavate to necessary level to construct basement garage and overlying residence. Application also includes…
- PA/04539/25 Zebbug: Construction of first floor level over existing one storey townhouse and alterations at ground floor consisting of opening in façade to form a private car…
- PA/05560/23 Zebbug: To propose changes to layout configuration as already approved by PA8888/20 and to propose minor changes to facade.
- PA/04810/25 Zebbug: Demolition of existing pre-1967 rooms, excavation and construction of reservoir and re-construction of rooms.
- PA/07821/24 Zebbug: Proposed demolition of existing rooms and construction of a two-storey dwelling.
- PA/00658/25 Zebbug: Additions and alterations to the existing property, including the restoration of the façade on Triq it-Twila.
- PA/03217/26 Zebbug: To carry out internal alterations and additions and alterations in facade.
- PA/05594/25 Zebbug: Proposed alterations to pre-1967 dwelling with the incorporation of a garage at ground floor level. To sanction roof structure at roof level.
More by JLZ+MBF Architects Architects
- PA/00892/20 Gharghur: Rehabilitation of existing dwelling, inclusive of demolition of structures and alterations to facade, and construction at first and second floor level.
- PA/00249/20 Qrendi: To change a terraced house to two overlying maisonette and apartment, which will include internal alterations addition of common area, lift, relocation of…
- PA/00019/20 Santa Venera: Sanctioning of existing villa as constructed, together with part demolition of the washroom and construction of an additional floor to the existing property.
All applications by JLZ+MBF Architects Architects
More from Jamar Malta Ltd
- PA/00105/23 Zebbug: Correction of site configuration and sanctioning of the internal layout at receded floor level.