propertylist

Planning applications in Zebbug

1,145 planning applications since 11 December 2019: 679 granted, 26 refused, 125 pending. Tallest granted: 5 floors. 220 applications so far in 2026, 76 validated in the last 90 days. 96% of decided applications were granted. Granted buildings are typically 3 floors. 1,274 residential units applied for.

Most common works: Sanctioning (389), Demolition & New Construction (Residential) (127), Change of Use (73), Restoration (56), New Construction (56).

Busiest streets: Triq l-Imdina (79), Triq il-Kbira (61), Triq is-Siggiewi (30), Triq il-Grazzja (24), Triq Paris (22), Triq Frans Sammut (20).

Most active periti here: Charles Buhagiar, Anthony Gatt, Roderick Camilleri, Henry Attard, Mario Balzan.

Latest decisions in Zebbug

  • PA/07265/25 Zebbug: Proposed installation of a solar powered illuminated non LED billboard. Refused, validated 12 November 2025, decided 30 October 2026
  • PA/01846/26 Zebbug: To construct two levels of basement garages and overlying ten apartments. Granted, validated 18 March 2026, 1 floor, decided 27 October 2026
  • PA/02524/26 Zebbug: Proposed demolition of existing building, excavation for basement level -1 and reservoir, construction of Class 4A office at ground floor and 4 overlaying… Granted, validated 22 April 2026, 2 floors plus a receded floor, decided 27 October 2026
  • PA/08354/25 Zebbug: To sanction the relocation of an approved reservoir covered by PA/3720/20. Granted, validated 7 January 2026, decided 27 October 2026
  • PA/00063/26 Zebbug: Alterations at ground and first floor. Demolition of existing washroom and timber canopy at roof level. Extension of residential property at second floor and… Granted, validated 14 January 2026, 3 floors, decided 27 October 2026

Latest applications in Zebbug

Planning in Zebbug: common questions

How many planning applications are there in Zebbug?

PropertyList has 1,145 Planning Authority applications on record for Zebbug, 220 of them from 2026 and 76 validated in the last 90 days.

What share of planning applications are approved in Zebbug?

96% of the 705 decided applications in Zebbug on record were granted (679 granted, 26 refused). Each case depends on its own site and the local plan.

How high can you build in Zebbug?

Granted applications in Zebbug with a stated height are typically 3 floors; the tallest granted on record is 5 floors. Heights are set street by street in the local plan, so check the street you're interested in on the PropertyList height map.

Which periti submit the most applications in Zebbug?

The most active periti in Zebbug are Charles Buhagiar (40), Anthony Gatt (34), Roderick Camilleri (30), Henry Attard (25), Mario Balzan (18).

How do I object to a planning application in Zebbug?

Send a representation to the Planning Authority before the "comments close" date shown on the application. PropertyList shows that date on each application page, with a link to the case on the Planning Authority website.

Planning map of Malta · Market insights · All localities