PA/01365/26: Development of vacant site in Zebbug
Plot number 8, Triq il-Prof. Daniel Callus, Zebbug
Development of vacant site, including excavation to include a water reservoir, one basement level which accommodates 3 two car garages, a ground floor and first floor duplex unit, a unit at second floor and a duplex unit at third and penthouse level with a pool a roof level, and a common pool at ground floor level.
- Status
- Pending (Awaiting Decision)
- Location
- Plot number 8, Triq il-Prof. Daniel Callus, Zebbug
- Locality
- Zebbug
- Applicant
- Mario Bezzina
- Perit
- Offset Architecture Studio
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- Pool
- Height
- 3 floors plus a receded floor
- Residential units
- 5
- Received
- 23 January 2026
- Validated
- 4 March 2026
- Published
- 4 March 2026
- Comments close
- 10 April 2026
- Recommendation
- Refuse Permission
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Plot number 8, Triq il-Prof. Daniel Callus, Zebbug
5 other applications on the same street: 1 granted, 0 refused, 0 pending.
On Triq il-Prof. Daniel Callus: 5 other applications, 1 granted and 0 refused. Periti active on this street: Kyle Vella.
- PA/06394/25 Zebbug: To demolish existing building and construct basement garages and car spaces, and overlying apartments at ground first second and third floor and penthouses at…
- PA/06973/23 Zebbug: Alteration to existing garage to convert existing ground floor garage to basement garage and change of use from garage to residential. Work to include…
- PA/00047/22 Zebbug: Proposed alteration to existing elevation.
- PA/00266/22 Zebbug: Proposed change of use from garage to dwelling, proposal includes internal alterations to accommodate dwelling, and alterations to facade.
- PA/02526/21 Zebbug: Additions and alterations to existing building. Work to include change of use from garage to Class 4B shop
More by Offset Architecture Studio
- PA/07045/26 Naxxar: Minor changes, to sanction, from PA/5983/17, consisting of internal room dimensions, closing of internal door between bathroom and bedroom, and aperture…
- PA/06328/26 Vittoriosa (Birgu): Restoration of the main facade.
- PA/05041/26 Rabat (Gozo): Variations from the official building alignment.
- PA/04281/26 Rabat: Changes and additions to PA/395/22, creation of belvedere with underlying agricultural store behind the grade 1 garden, changes to block G, conversion to…
- PA/04065/26 Birkirkara: Changes to facade, replacement of masonry railing with metal railing and Maltese closed balcony with open balcony with metal railing.
- PA/03697/26 Dingli: Minor changes from PA/02284/23, including the relocation of the reservoir from basement -1 to basement -2, insertion of two apertures at basement level -1 and…
All applications by Offset Architecture Studio
More from Mario Bezzina
- PA/06742/26 Zebbug: Proposed alterations to an existing townhouse, including internal and external modifications, amendments to existing openings, removal and redevelopment of a…
- PA/05305/24 Mdina: To sanction pre-1994 part deteriorated room, proposed demolition of existing pre-1967 and 1994 room, re-construction of room using same dimensions and same or…
- PA/01618/21 Birkirkara: Proposed change of use from Class 4B (fruit and veg) to Class 4D (cooking on-site) outlet. Proposal to include minor internal alterations and sanctioning of…