PA/01370/22: change of use at ground floor only in Attard
39, The Coffee Shop, Triq l-Imdina, Attard
Proposed change of use at ground floor only from Class 4C to Class 4D on approved PA06106/17.
- Status
- Status being checked
- Location
- 39, The Coffee Shop, Triq l-Imdina, Attard
- Locality
- Attard
- Applicant
- Mr Graham Borg
- Perit
- Perit George Farrugia
- Type of works
- Change of Use
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 39, The Coffee Shop, Triq l-Imdina, Attard
65 other applications within 300 m: 36 granted, 6 refused, 5 pending. 86% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/07979/25).
On Triq l-Imdina: 53 other applications, 31 granted and 4 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: Mannie Galea, JG Periti, Frank Muscat, Dmitry Angelov, Thomas Tanti.
Approval estimate for change of use applications like this here: about 94% (likely range 64–100%, low reliability, from 1 comparable decision nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/01136/24 Attard: Proposed installation of one non-LED billboard.
- PA/07397/24 Attard: Proposed internal and external alterations to basement and ground floor levels for Class 4B retail. Sanctioning of internal and external alterations for Class…
- PA/01291/21 Attard: Proposed installation of additional carwash to existing service station.
- PA/03301/25 Attard: Proposed shifting of rubble wall, and to enlarge reservoir approved in PA/07157/22.
- PA/04362/24 Attard: Proposed sanctioning of existing rubble walls, construction of a new rubble wall and underground reservoir.
- PA/02834/25 Attard: Proposed clearing of site and excavation and construction of reservoir and generator room, overlying car-wash, including signage and alterations to boundary…
- PA/03074/25 Attard: To sanction. Reconstruction of rubble wall and dismantling of room and proposed reinstatement of rubble wall and reconstruction of room
- PA/02978/22 Attard: To sanction extension to residence approved in RG299/16 comprising internal alterations to garage to form a domestic store and a bathroom.
- PA/01605/22 Attard: To sanction shifting of dividing wall at the front of the penthouse and horizontal railing as constructed. To install retractable awning at the back of the…
- PA/04240/25 Attard: To sanction boundary walls from that previously approved in PA 7314/04.
- PA/01858/23 Attard: Demolition of room and boundary walls. Sanctioning of part boundary wall. Construction of boundary wall and fixing of timber gate.
- PA/04959/24 Attard: To carry out alterations to existing ramp and entrance to basement garages and sanction changes to garage and common drive from those approved in PA 3097/01.
- PA/03987/23 Attard: To sanction existing reservoir, rubble walls, soil and timber gate. Proposal includes construction of a pump room.
- PA/02636/22 Attard: Minor alteration to existing apertures and shifting of internal partitions.
- PA/06759/23 Attard: To sanction installation of services and screening at roof level
More by George Farrugia
- PA/07573/26 Xewkija: Proposed internal alterations to existing basement and ground floor, proposed partial excavation and construction of basement level -2 and ground floor, and…
- PA/07564/26 Mgarr: To sanction existing concrete structure to support dangerous rock.
- PA/07482/26 Sliema: Alterations to approved permit (PA8074/24), including alterations to the common stairs and relocation of a lift; internal alterations to the approved…
- PA/07474/26 Cospicua (Bormla): Proposed alterations to approved PA/04287/24.
- PA/07418/26 Birzebbuga: Minor internal alterations to approved drawings as per PA/6127/23 and excavation for one floor garage.
- PA/07402/26 Rabat: Proposed dismantling of existing pre-1978 room walls and reconstruct using fair faced masonry, excavation of reservoir and installation of flat laid solar…