PA/01457/23: carry out internal and external alterations to in San Pawl il-Bahar
4, Casa Faro, Triq is-Simar, Xemxija, San Pawl il-Bahar
To carry out internal and external alterations to existing first floor maisonette. To extend existing dwelling by constructing a second floor and third floor washroom. To demolish existing external staircase leading to roof. To change existing aluminium apertures with pvc apertures.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- 4, Casa Faro, Triq is-Simar, Xemxija, San Pawl il-Bahar
- Locality
- San Pawl il-Bahar
- Applicant
- Mr Christian Carabott
- Perit
- Perit Gaetano k/a Tano Zammit
- Application type
- Full development permission - Summary Process
- Zone
- Within Development Zone
- Type of works
- New Construction (Residential)
- Height
- 4 floors
- Received
- 13 December 2022
- Validated
- 26 April 2023
- Published
- 15 March 2023
- Comments close
- 30 March 2023
- Decision
- Acceptable
- Permit expires
- 10 May 2028
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 4, Casa Faro, Triq is-Simar, Xemxija, San Pawl il-Bahar
83 other applications within 300 m: 47 granted, 1 refused, 4 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 6 floors (PA/01127/24).
On Triq is-Simar: 12 other applications, 6 granted and 0 refused; granted buildings are typically 6 floors, the tallest 6. Periti active on this street: Bezzina & Cole Architects & Engineers, Joseph Bondin, Charles Buhagiar.
Approval estimate for new construction applications like this here: about 94% (likely range 64–100%, low reliability, from 6 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/02919/21 San Pawl il-Bahar: Proposed excavation of a vacant plot to construct two underground basement level carpark (with 13 No. open parking bays substituting the 8 No. closed 1-car…
- PA/03529/22 San Pawl il-Bahar: Proposed alterations and sanctioning of work from PA2919/21, The alterations are: Change in the site perimeter as per latest survey, construction of garages…
- PA/04281/25 San Pawl il-Bahar: Variations from official building alignments to the development constructed under the remit of permit RG/00373/17 and sanctioning of buttress ground slab…
- PA/05413/25 San Pawl il-Bahar: To sanction property as existing (original permit not retrieved).
- PA/01027/26 San Pawl il-Bahar: To demolish existing garages and apartments, excavate and construct garage at basement level, 1no maisonette at ground floor level and 6no in total apartments…
- PA/06539/23 San Pawl il-Bahar: Sanctioning of balconies and alterations at second floor level from approved DS/00251/22, and proposed balcony extension at first floor level.
- PA/04063/25 San Pawl il-Bahar: Sanctioning of cantilevers and alterations at second floor level from approved DS/00251/22, and proposed balcony extension at first floor level. Proposal also…
- PA/03001/21 San Pawl il-Bahar: To convert approved Class 3B, 3-star hotel and Class 4D restaurant, to a Class 3B, 3-star hotel and stand alone Class 4D restaurant, convert 2 units to four…
- PA/01247/26 San Pawl il-Bahar: To remove stairs connecting the approved Class 3B, 3-star hotel and standalone Class 4D restaurant and, sanction minor alterations and signage from PA/3001/21…
- PA/00046/20 San Pawl il-Bahar: Proposed refurbishment of existing villa including, demolition & excavation of existing pool area, construction of a 4 car garage with overlying swimming…
- PA/00077/22 San Pawl il-Bahar: To sanction the: installation of 1 timber bar; a timber lounge area; an annex to serve as storage and toilets; the opening of door interconnecting restaurant…
- PA/06772/26 San Pawl il-Bahar: Proposed change of use from Class 1 residential to Class 4A dentist. Proposed minor internal alterations and addition of platform lift for accessibility.
- PA/01983/26 San Pawl il-Bahar: Sanctioning of the existing apartment following a detailed survey, which identified minor deviations from the approved plans under PA/05597/08, including…
- PA/06604/23 San Pawl il-Bahar: To construct boundary wall and gate. Change of use from a vacant site to private parking area.
- PA/01418/26 San Pawl il-Bahar: Replacement of the existing french window with a new lightweight balcony using the same materials.
More by Gaetano k/a Tano Zammit
- PA/04322/26 Birkirkara: Cleaning and restoration of external facades.
- PA/01359/26 Lija: To demolish existing dilapidated rooms on a restricted site, to construct a two-storey dwelling including the excavation and construction of a rainwater…
- PA/00088/26 Dingli: To replace existing masonry balustrade from first floor open balcony with an enclosed traditional Maltese timber balcony and to refrain from forming a window…
- PA/07775/25 San Pawl il-Bahar: To change use of existing, basement level -2, domestic garage to a public service garage (for garaging of 'Y-plate' vehicles).
- PA/05576/25 Rabat: To restore four masonry statues located at first floor level of the convent's facade.
- PA/03021/25 Marsa: To replace 6 No. (six) deteriorated solid timber beams with 6 No. (six) new, laminated timber beams. Works include numbering, dismantling and reconstruction…