PA/01536/24: alterations at fourth floor level and construction in San Pawl il-Bahar
Sea Breeze Court, Flat 9, Triq J. Quintinus, San Pawl il-Bahar
Proposed alterations at fourth floor level and construction of two apartments at fifth floor level and two penthouses at receded floor level. Proposal also includes extension of common parts and variations from the official alignment.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- Sea Breeze Court, Flat 9, Triq J. Quintinus, San Pawl il-Bahar
- Locality
- San Pawl il-Bahar
- Applicant
- Matthew Navarro
- Perit
- Perit Samuel Formosa
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- New Construction (Residential)
- Height
- 6 floors plus a receded floor
- Residential units
- 4
- Received
- 7 November 2023
- Validated
- 20 March 2024
- Published
- 20 March 2024
- Comments close
- 26 April 2024
- Recommendation
- Grant Permission
- Decision
- Grant Permission
- Decision date
- 5 June 2025
- Permit expires
- 9 July 2030
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Sea Breeze Court, Flat 9, Triq J. Quintinus, San Pawl il-Bahar
157 other applications within 300 m: 93 granted, 5 refused, 19 pending. 95% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/08169/25).
On Triq J. Quintinus: 21 other applications, 12 granted and 0 refused; granted buildings are typically 7 floors, the tallest 8. Periti active on this street: David Mifsud Parker, Silvienne Camilleri.
Approval estimate for new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 12 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/01660/23 San Pawl il-Bahar: Change of use from greengrocer approved in PA7432/03 to Class 4C outlet.
- PA/05797/23 San Pawl il-Bahar: To sanction minor internal alterations at second floor to the approved PA/03952/99.
- PA/08169/25 San Pawl il-Bahar: Proposed alterations to property, part already approved by virtue of PA/11078/17; and construction of new unit at seventh floor level with a different layout…
- PA/01199/25 San Pawl il-Bahar: To sanction internal and external variations from PA6255/06.
- PA/02922/21 San Pawl il-Bahar: Conversion of 1no. penthouse (originally approved by PA/7434/06 into 1no. apartment at fifth floor level and construct 1no. apartment at receded floor level.…
- PA/00396/24 San Pawl il-Bahar: Proposed construction of additional residential unit at receded sixth floor level, and alterations to existing common area.
- PA/05505/24 San Pawl il-Bahar: Change of use from greengrocer approved in PA7432/03 to Class 4B outlet as per LN74 of 2014.
- PA/04951/26 San Pawl il-Bahar: Proposed roofing of the front garden area with a temporary lightweight glass and steel canopy, and installation of new signage on the upper part of the…
- PA/04782/24 San Pawl il-Bahar: Proposed demolition of existing terrace house, excavation of 1 level basement housing, 8 private parking car spaces, and construction of 15 dwellings from…
- PA/03153/22 San Pawl il-Bahar: To sanction internal and external alterations from approved permit PA3787/99 including removal, addition and shifting of walls at second floor level and…
- PA/04408/26 San Pawl il-Bahar: Change of use from private car garage to a public service garage.
- PA/02650/21 San Pawl il-Bahar: To install canopy in front garden, in connection to Class 4B retail outlet (PA/02113/19)
- PA/00049/21 San Pawl il-Bahar: Change of use from garage to Class 4B Shop.
- PA/02274/26 San Pawl il-Bahar: Proposed sanctioning of variations to garage from approved permit PA/05947/09. Proposed changes to facade.
- PA/07956/24 San Pawl il-Bahar: To sanction garage as built (plotting sheets not traced), and to propose change of use from garage to Class 4D snack-bar.
More by Samuel Formosa
- PA/07801/26 San Pawl il-Bahar: To renew PA/00339/18 - To sanction garage at basement level and construct an overlying room at ground floor level as an extension to existing dwelling and…
- PA/07590/26 Pieta: To sanction existing garage as built.
- PA/07299/26 Pieta: Sanctioning of existing minor internal alterations to garage.
- PA/07246/26 Zebbug: Proposed excavation of part of site to form a basement level, minor internal alterations to the existing dwelling, construction of an additional floor and…
- PA/07114/26 Birzebbuga: Proposed change of use from Class 1A residential unit to Class 2C childcare including internal and external alterations.
- PA/07083/26 Qormi: Proposed modification to existing staircase at receded floor level and proposed addition of pool at roof floor level.
All applications by Samuel Formosa
More from Matthew Navarro
- PA/06231/26 San Pawl il-Bahar: Sanctioning of apartments at fourth, fifth and sixth floor level, as built, in lieu of approved planning permits PA/06531/94 and PA/01536/24.
- PA/05563/26 San Pawl il-Bahar: To sanction layout of apartment as is. Previous permit is PAPB524/87.
- PA/01274/26 Zebbug: Proposed demolition, excavation, and proposed construction of garage, shop Class 4B, and 8 apartments including recessed floor level.
- PA/07057/24 St Julians: Sanctioning of pool and staircase as constructed during PA/11207/18.
- PA/03211/24 St Julians: To propose for the redevelopment of the current site entails the demolition of the existing structure, followed by excavation to align one floor with street…
- PA/01584/24 St Julians: Proposed demolition of existing structure while generally retaining the facade, with minor modifications to include a garage entrance door; excavation and…