PA/02274/26: sanctioning of variations to garage from approved in San Pawl il-Bahar
22, Triq Ananija, Bugibba, San Pawl il-Bahar
Proposed sanctioning of variations to garage from approved permit PA/05947/09. Proposed changes to facade.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- 22, Triq Ananija, Bugibba, San Pawl il-Bahar
- Locality
- San Pawl il-Bahar
- Applicant
- Ryan Camilleri
- Perit
- Perit Andrew Farrugia Masini
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- Sanctioning
- Received
- 18 March 2026
- Validated
- 8 April 2026
- Published
- 8 April 2026
- Comments close
- 8 May 2026
- Recommendation
- Grant Permission
- Decision
- Grant Permission
- Decision date
- 10 September 2026
- Permit expires
- 23 September 2031
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 22, Triq Ananija, Bugibba, San Pawl il-Bahar
161 other applications within 300 m: 92 granted, 7 refused, 23 pending. 93% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/08169/25).
On Triq Ananija: 2 other applications, 1 granted and 0 refused.
Approval estimate for sanctioning applications like this here: about 92% (likely range 62–100%, low reliability, from 46 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/00914/26 San Pawl il-Bahar: Changes to already approved DN 339/21 including construction of parapet wall, installation of PV panels below parapett wall level and sanctioning of front…
- PA/02564/22 San Pawl il-Bahar: To sanction variations from the approved permit PA1797/94 by extension to store and proposed change of use from store to Class 4B shop and proposed raising of…
- PA/04951/26 San Pawl il-Bahar: Proposed roofing of the front garden area with a temporary lightweight glass and steel canopy, and installation of new signage on the upper part of the…
- PA/00049/21 San Pawl il-Bahar: Change of use from garage to Class 4B Shop.
- PA/04402/25 San Pawl il-Bahar: To construct overlying apartments onto the existing roof level at 4th, 5th and 6th floor level.
- PA/07956/24 San Pawl il-Bahar: To sanction garage as built (plotting sheets not traced), and to propose change of use from garage to Class 4D snack-bar.
- PA/00829/26 San Pawl il-Bahar: To propose changes from PA/01082/24, to change the ground floor from Class 1 to Class 2C and to construct a pool at roof level.
- PA/01082/24 San Pawl il-Bahar: To demolish the existing house, excavate one floor together with the reservoir and to construct a maisonette and 12 apartments and 1 penthouse.
- PA/06231/26 San Pawl il-Bahar: Sanctioning of apartments at fourth, fifth and sixth floor level, as built, in lieu of approved planning permits PA/06531/94 and PA/01536/24.
- PA/01536/24 San Pawl il-Bahar: Proposed alterations at fourth floor level and construction of two apartments at fifth floor level and two penthouses at receded floor level. Proposal also…
- PA/04408/26 San Pawl il-Bahar: Change of use from private car garage to a public service garage.
- PA/00349/21 San Pawl il-Bahar: To sanction dwelling as built
- PA/02785/26 San Pawl il-Bahar: To sanction the development as built from the approved permit PA/03030/07. The proposal includes the partial demolition of the 4th, 5th, and roof structures,…
- PA/04782/24 San Pawl il-Bahar: Proposed demolition of existing terrace house, excavation of 1 level basement housing, 8 private parking car spaces, and construction of 15 dwellings from…
- PA/01191/22 San Pawl il-Bahar: To construct 4 apartments overlaying an existing block of apartments and garages. Proposed consists of 3 apartments at fifth floor and 1 apartment at sixth…
More by Andrew Farrugia Masini
- PA/07050/26 San Pawl il-Bahar: Proposed demolition of existing dilapidated pre-1967 rooms and excavation and construction of new agricultural store. Proposed rubble wall along the entrance.…
- PA/06582/26 Fgura: Proposed demolition of existing stores and workshop, excavation for new foundations, construction of educational Scouts premises on two floors, a gymnasium,…
- PA/05426/26 Mosta: Proposed demolition of existing property, excavation of lift pit and enlargement of existing reservoir. Proposed construction of ground floor garage for…
- PA/04998/26 San Pawl il-Bahar: To sanction variations carried out to Apartment 8 at third floor level from that approved under PA/00438/05.
- PA/03867/26 Balzan: Proposed opening of a garage door in place of the existing window and use of the front room as a garage for the parking of a private car. Proposed alterations…
- PA/02169/26 Mosta: Proposed change of use from Class 2A medical clinic approved in PA 1693/25 to Class 4B shop with ancillary Class 5A packaging of beauty and personal care…
All applications by Andrew Farrugia Masini
More from Ryan Camilleri
- PA/04954/25 Mellieha: Sanctioning of the creation of two garages from an existing garage approved in PA/3053/19, and the proposed blocking of the existing opening between the two…
- PA/08260/24 Mellieha: Proposed alterations to approved permit PA/6910/22 to include extension of level -1, modification to washroom at roof level, and proposed internal and…
- PA/08103/24 Ghajnsielem: To sanction minor variations from drawings approved in PA/02814/07, mainly shifting of walls and apertures and slight increase in floor area.
- PA/02397/23 San Gwann: To sanction stairwell from ground floor and first floor maisonette as built, alterations to first floor maisonette and stairwell and construction of 4…