propertylist

PA/01704/22: change of use from Class 1A residential in San Pawl il-Bahar

Block D, Triq il-Bekkum c/w, Triq it-Tamar, Qawra, San Pawl il-Bahar

Proposed change of use from Class 1A residential to Class 3B hotel. Alterations to all approved levels from Level -2 to Level 7 as approved in PA 8655/18 to include 168 rooms games room, pub, louge, wine room, reception, bck of house, indoor pool and spa at ground floor level. Extension to approved Level 7 and proposed construction of additional two levels 8 and 9 including the construction of outdoor pool at roof level.

Status
Status being checked
Location
Block D, Triq il-Bekkum c/w, Triq it-Tamar, Qawra, San Pawl il-Bahar
Locality
San Pawl il-Bahar
Applicant
Marine Accomodation Limited
Perit
Perit Glenn Zammit
Type of works
Change of Use
Height
10 floors

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Block D, Triq il-Bekkum c/w, Triq it-Tamar, Qawra, San Pawl il-Bahar

105 other applications within 300 m: 77 granted, 1 refused, 5 pending. 99% of decided applications nearby were granted. Tallest granted nearby: 11 floors (PA/02964/23).

On Triq il-Bekkum: 1 other application, 1 granted and 0 refused.

Approval estimate for change of use applications like this here: about 95% (likely range 65–100%, low reliability, from 9 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Glenn Zammit

All applications by Glenn Zammit

More from Marine Accomodation Ltd

All planning applications in San Pawl il-Bahar