propertylist

PA/01778/25: construction of a 63-room hotel Class 3B in St Julians

Marjoe, Triq Luigi Apap c/w, Triq Ross, San Giljan

Proposed construction of a 63-room hotel Class 3B, distributed from the fist to the ninth floor, with a pool and sun terrace on the tenth floor, amenities on the ground floor, and a basement level.

Status
Withdrawn (This application for development permission has been withdrawn by the applicant.)
Location
Marjoe, Triq Luigi Apap c/w, Triq Ross, San Giljan
Locality
St Julians
Applicant
CF Hotels Ltd Attn: Clifton Cassar
Perit
Perit Maria Schembri Grima
Application type
Full development permission
Zone
Within Development Zone
Type of works
Hotel
Height
10 floors
Received
31 January 2025
Validated
18 March 2025
Published
18 March 2025
Comments close
24 April 2025

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Marjoe, Triq Luigi Apap c/w, Triq Ross, San Giljan

10 other applications on the same street: 6 granted, 0 refused, 1 pending. 100% of decided applications nearby were granted.

On Triq Luigi Apap: 10 other applications, 6 granted and 0 refused. Periti active on this street: Maria Schembri Grima, Alexander Bigeni.

Approval estimate for hotel applications like this here: about 95% (likely range 65–100%, low reliability, from 1 comparable decision nearby). No granted application nearby states a height to compare with. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Maria Schembri Grima

All applications by Maria Schembri Grima

More from CF Hotels Ltd

All planning applications in St Julians