PA/02165/22: sanction alterations to facade from approved PA09469/19 in Birzebbuga
58/59, Il-Bajja Is-Sabiha, Birzebbuga
To sanction alterations to facade from approved PA09469/19.
- Status
- Status being checked
- Location
- 58/59, Il-Bajja Is-Sabiha, Birzebbuga
- Locality
- Birzebbuga
- Applicant
- Ms Maria Dolores Carabot
- Perit
- Dr Edwin Mintoff
- Type of works
- Sanctioning
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 58/59, Il-Bajja Is-Sabiha, Birzebbuga
2 other applications on the same street: 2 granted, 0 refused, 0 pending.
On Il-Bajja Is-Sabiha: 2 other applications, 2 granted and 0 refused.
Approval estimate for sanctioning applications like this here: about 94% (likely range 64–100%, low reliability, from 1 comparable decision nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/07327/25 Birzebbuga: Proposed demolition of existing dwelling, excavation of basement level, retaining the facade, and construction of another dwelling from basement till receded…
- PA/03087/23 Birzebbuga: To sanction alterations to the facade on first floor from approved PA/02165/22.
More by Edwin Mintoff
- PA/07655/26 Munxar: Proposed extension and changes to approved permit PA/01661/20. Proposal consists of the excavation of part of garden, water reservoir under ground floor pool…
- PA/07457/26 Gzira: Amendments to facade for structural integrity.
- PA/07455/26 Sliema: Proposed redesign of bar/cafeteria entrance, including new sign.
- PA/07431/26 St Julians: To sanction the change of use from showroom approved in PA03705/99 to a convenience shop Class 4B including internal layout changes, added signage,…
- PA/07407/26 Sliema: To demolish the existing staircase and carry out internal and external alterations to the development approved under PA/06318/23, including the provision of…
- PA/07388/26 Marsaskala: Proposed demolition of existing hotel and proposed construction of Class 3B 4 star hotel.