PA/02260/21: Partial demolition of existing residential dwelling together in Iklin
Il-Barriera, Sqaq In-Naxxar off, Triq tal-Balal, Iklin
Partial demolition of existing residential dwelling together with ancillary structures and consolidation of structures into a new office Class 4A and include basement/warehouse Class 6A and surrounding landscaping. Proposal includes public service parking spaces at basement level.
- Status
- Status being checked
- Location
- Il-Barriera, Sqaq In-Naxxar off, Triq tal-Balal, Iklin
- Locality
- Iklin
- Applicant
- Mr David Gauci
- Perit
- JG Periti
- Type of works
- Demolition
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Il-Barriera, Sqaq In-Naxxar off, Triq tal-Balal, Iklin
No other applications recorded nearby yet.
Approval estimate for demolition applications like this here: about 95% (likely range 65–100%, low reliability, from 0 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
More by JG Periti
- PA/07460/26 San Pawl il-Bahar: Renewal of PA/977/14- Demolition of existing bank and erect same including basement parking and contingency building.
- PA/07376/26 Rabat: Proposed partial excavation of site, while retaining and preserving the rest of the site due to the presence of high value archeological features, and…
- PA/07328/26 San Pawl il-Bahar: Proposed construction of pump chamber.
- PA/07217/26 Swieqi: Relocation of public service garage space, addition of pool at roof level, reconfiguration of reservoirs and other changes.
- PA/06980/26 Tarxien: Proposed demolition of existing dwellings, removal of material, excavation, and construction of 6 basement garages, 2 maisonettes, 6 apartments and 1 penthouse.
- PA/06947/26 Iklin: Sanctioning of clearance of site and excavation. Proposed open storage and construction of 2 floors of warehousing Class 6A at lower basement, basement and…
More from David Gauci
- PA/07328/26 San Pawl il-Bahar: Proposed construction of pump chamber.
- PA/04164/26 Naxxar: Proposed placing of tables and chairs including umbrellas.
- PA/03686/26 Zurrieq: To reconstruct existing agricultural room which was demolished for the construction of Triq Birzebbugia, Hal Far.
- PA/02023/26 Naxxar: Construction of burial wall including chambers, vertical landscaping and cladding.
- PA/01955/26 Naxxar: To demolish existing townhouse and construct a semi-basement garage, 1 maisonette, 3 apartments and a penthouse. Proposal includes the construction of a roof…
- PA/03933/25 Iklin: Proposed removal of dilapidated structures, repairing of dangerous retaining wall, replenishment of soil and to sanction location and size of agricultural…