PA/02948/26: demolish existing stairwell room at roof level in Santa Venera

Floreal, Triq Braille, Santa Venera

To demolish existing stairwell room at roof level and slab over first floor level and to carry out minor internal and external alterations at ground and first floor levels. The proposal also includes the construction of an additional bedroom and bathroom at roof level with the installation of photovoltaic panels at upper roof level.

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
Floreal, Triq Braille, Santa Venera
Locality
Santa Venera
Applicant
Frankie Camilleri
Perit
Perit Christian Chetcuti
Application type
Full development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction
Height
2 floors
Received
1 April 2026
Validated
6 May 2026
Published
6 May 2026
Comments close
5 June 2026
Recommendation
Grant Permission
Decision
Grant Permission
Decision date
28 September 2026
Permit expires
7 October 2031

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Floreal, Triq Braille, Santa Venera

147 other applications within 300 m: 93 granted, 5 refused, 18 pending. 95% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/01819/24).

On Triq Braille: 9 other applications, 7 granted and 0 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: Frank Muscat.

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 12 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Christian Chetcuti

All applications by Christian Chetcuti

More from Frankie Camilleri

All planning applications in Santa Venera