PA/03563/24: sanction the existing height of the warehouse in Attard
Warehouse No.6 & 7, Ferreri Buildings, Ta' Qali National Park, Triq l-Idwart, Ta Qali, Attard
To sanction the existing height of the warehouse (Class 6A) from that approved in PA1894/00, to sanction a wall between the stores, to excavate the ground slab to a lower level, to narrow the existing opening to the stores, alter the openings at the back overlooking the backyard and construct two rooms in the backyard for storage.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- Warehouse No.6 & 7, Ferreri Buildings, Ta' Qali National Park, Triq l-Idwart, Ta Qali, Attard
- Locality
- Attard
- Applicant
- Dr Andrea Gera De Petri
- Perit
- Perit Benny Cortis
- Application type
- Full development permission
- Zone
- Outside Development Zone
- Type of works
- Sanctioning
- Received
- 15 April 2024
- Validated
- 4 September 2024
- Published
- 4 September 2024
- Comments close
- 4 October 2024
- Recommendation
- Grant Permission
- Decision
- Grant Permission
- Decision date
- 24 January 2025
- Permit expires
- 5 February 2030
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Warehouse No.6 & 7, Ferreri Buildings, Ta' Qali National Park, Triq l-Idwart, Ta Qali, Attard
4 other applications on the same street: 3 granted, 0 refused, 0 pending. 100% of decided applications nearby were granted.
On Triq l-Idwart: 4 other applications, 3 granted and 0 refused. Periti active on this street: Sebastian Grima.
Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 2 comparable decisions nearby). Outside the development zone, where approvals are harder. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/07612/25 Attard: To sanction internal alterations and proposed construction of additional floor to be used for Class 6A storage.
- PA/04865/24 Attard: To sanction internal alterations and proposed construction of additional floor to be used for Class 6A storage.
- PA/01611/24 Attard: Upgrade of PA/04263/21 by extending the first floor by circa 280 sqm and minor additions at ground floor.
- PA/02784/21 Attard: To increase the height of an existing building from 8 metres to 10 metres as shown in the proposed drawings.
More by Benny Cortis
- PA/07636/26 Safi: To sanction the existing building as built from that approved in PA/06250/16. Sanctioning includes: correction of plot depth following survey, minor shifting…
- PA/06997/26 Birzebbuga: Demolition of the existing ground floor from that approved in PA/00261/25, construct a ground floor domestic store, including alterations to the existing…
- PA/06007/26 Rabat: To construct a staircase between the basement garage and the ground floor level, including partial demolition of the slab to accommodate the staircase,…
- PA/05023/26 Qormi: To sanction the existing dwelling at receded floor level as built from that approved in DN/01510/16. Sanctioning includes shifting of walls, including an…
- PA/04855/26 Birkirkara: To demolish the existing first-floor elevated maisonette, retaining the existing facade, construct a new staircase from the ground floor to the first-floor…
- PA/04258/26 Marsaskala: To demolish existing apartments at the third-floor level, reconstruct three apartments at the third-floor level and two penthouses at the receded floor level.
All applications by Benny Cortis
More from Andrea Gera De Petri
- PA/06687/23 Marsa: Proposed excavation of site to form basement parking; warehouse (6A) at ground and first floor, and office (4A) and warehouse (6A) at setback floor. Proposal…
- PA/04367/23 Belt Valletta: Refurbishing and restoration of office building (Class 4A) including internal alterations, demolitions and reconstruction with new floors and extension on…
- PA/04025/23 Zebbug: Proposed apartment building which includes excavation of two basement levels for 32 garages; ground floor, 3 typical floors and receded level with total of 23…
- PA/03454/23 Marsa: Proposed excavation of site to form basement parking, ground and first floor warehouse (6A) and office (4A) at second floor. Proposal includes the…
- PA/02720/23 Marsaxlokk: Removal of low dilapidated rubble walls, to excavate the existing un-built property as shown in the site plan and section up to the required levels, and…
- PA/00978/23 Mgarr: To erect apartment block with one 1-bed apartment, three 3-bed apartments, penthouse, and underlying garage at basement level.