PA/04629/24: Demolition of back room in Balzan
155, St. John, Triq Birbal, Balzan
Demolition of back room, internal alterations to existing pre-1968 residential property and construction of additional receded floor and chimney.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- 155, St. John, Triq Birbal, Balzan
- Locality
- Balzan
- Applicant
- Olivia Cafolla
- Perit
- Perit Karl Ebejer
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- Demolition & New Construction (Residential)
- Residential units
- 1
- Received
- 13 June 2024
- Validated
- 17 July 2024
- Published
- 17 July 2024
- Comments close
- 2 September 2024
- Recommendation
- Grant Permission
- Decision
- Grant Permission
- Decision date
- 4 March 2025
- Permit expires
- 18 March 2030
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 155, St. John, Triq Birbal, Balzan
168 other applications within 300 m: 101 granted, 3 refused, 14 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/04494/23).
On Triq Birbal: 20 other applications, 7 granted and 1 refused; granted buildings are typically 2 floors, the tallest 2.
Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 25 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/04494/23 Balzan: Demolition of existing terraced house and construction of (4) basement garages, (1) ground floor maisonette and (4) overlying apartments.
- PA/01972/26 Balzan: To propose minor internal and external alterations from approved permit by virtue PA/07068/22 and extension at receded floor level.
- PA/05105/25 Balzan: Internal and external alterations of Class 4A offices, including installation of lift to approved permit PA7357/17.
- PA/03458/21 Balzan: Proposed work to include changes on front facade, extension to hallway at first floor, increase in size and overall internal height of washroom and minor…
- PA/03549/23 Balzan: Sanctioning of existing barber shop (Class 4B) with internal partitions, ramp in front yard, a/c and signage on the facade and services in the front yard from…
- PA/03018/25 Balzan: To demolish existing two storey dwelling and construct new dwelling over two floors plus receded floor.
- PA/03076/26 Balzan: Internal and external alterations to a pre-1967 townhouse. Works include restoration of facade.
- PA/04021/24 Balzan: Proposed alterations to that approved in PA/08992/21 consisting in the opening of entrance to garage complex at basement levels. Proposal includes alterations…
- PA/05086/25 Balzan: Proposed signage on facade.
- PA/02894/23 Balzan: Renewal of PA2574/15 (Change of use of vacant building to a Class 4B retail shop at ground floor level, an ancillary storage area at first floor level, and to…
- PA/00507/25 Balzan: Proposed demolition of existing terraced house, excavation of basement and reservoir. Proposed construction of 8 basement garages (private vehicle), two…
- PA/01031/21 Balzan: To sanction variations from previous permit PA/139/19 mainly internal and external alterations
- PA/05275/25 Balzan: To sanction minor variations from approved PA2738/23.
- PA/07008/23 Balzan: Proposed excavation of reservoir and basement for private vehicle garages. Proposed construction of basement, ground floor maisonettes with jacuzzi, first,…
- PA/02738/23 Balzan: To recede penthouse and stairwell facade to be compliant with DC 15.
More by Karl Ebejer
- PA/07131/26 Msida: Correction of site plan for PA/03679/16.
- PA/07010/26 Hamrun: Demolition of existing first floor maisonette excluding the facade wall. Replacing existing aluminum apertures with pvc apertures and the aluminum Maltese…
- PA/06307/26 San Pawl il-Bahar: Construction of three additional full floors and one receded floor over the existing building, comprising four apartments at each of the fourth and…
- PA/06122/26 Swieqi: Proposed extension to the existing third-floor penthouse, including minor internal alterations, the construction of an additional recessed penthouse at…
- PA/06008/26 Marsaskala: Proposed sanctioning of changes from approved permits PA/00889/07.
- PA/05704/26 Floriana: To sanction minor existing discrepancies from approved drawings.