PA/05154/25: Construction of staircase from receded to roof in San Pawl il-Bahar

150, 152, Triq Sir Luigi Preziosi, San Pawl il-Bahar

Construction of staircase from receded to roof floor levels and construction of pool and planter at roof level.

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
150, 152, Triq Sir Luigi Preziosi, San Pawl il-Bahar
Locality
San Pawl il-Bahar
Applicant
Steve Garrett
Perit
Perit Roderick Camilleri
Application type
Full development permission
Zone
Within Development Zone
Type of works
New Construction
Received
14 July 2025
Validated
1 October 2025
Published
1 October 2025
Comments close
8 October 2025
Recommendation
Grant Permission
Decision
Grant Permission
Decision date
6 November 2025
Permit expires
19 November 2030

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 150, 152, Triq Sir Luigi Preziosi, San Pawl il-Bahar

26 other applications on the same street: 17 granted, 2 refused, 4 pending. 89% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/07562/24).

On Triq Sir Luigi Preziosi: 26 other applications, 17 granted and 2 refused; granted buildings are typically 7 floors, the tallest 8. Periti active on this street: Fabrizio Baldacchino, Aquilina and Sammut Alessi, Stephen Farrugia, Kurt Camilleri Burlo', Martin Farrugia.

Approval estimate for new construction applications like this here: about 85% (likely range 55–100%, low reliability, from 2 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Roderick Camilleri

All applications by Roderick Camilleri

More from Steve Garrett

All planning applications in San Pawl il-Bahar