PA/06988/26: Demolition of existing first floor property and in San Pawl il-Bahar
1, Triq Sir Luigi Preziosi c/w, Triq San Luqa, San Pawl il-Bahar
Demolition of existing first floor property and proposed construction of 6 overlying units.
- Status
- Pending (Awaiting Recommendation)
- Location
- 1, Triq Sir Luigi Preziosi c/w, Triq San Luqa, San Pawl il-Bahar
- Locality
- San Pawl il-Bahar
- Applicant
- Antoine Sciberras
- Perit
- Perit Emmanuel Bonello
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- Demolition & New Construction
- Height
- 2 floors
- Residential units
- 6
- Received
- 10 September 2026
- Validated
- 21 October 2026
- Published
- 21 October 2026
- Comments close
- 20 November 2026
The public planning file has 17 documents: plans, reports, consultations and the decision.
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 1, Triq Sir Luigi Preziosi c/w, Triq San Luqa, San Pawl il-Bahar
26 other applications on the same street: 18 granted, 2 refused, 3 pending. 90% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/07562/24).
On Triq Sir Luigi Preziosi: 26 other applications, 18 granted and 2 refused; granted buildings are typically 7 floors, the tallest 8. Periti active on this street: Fabrizio Baldacchino, Aquilina and Sammut Alessi, Stephen Farrugia, Kurt Camilleri Burlo', Martin Farrugia.
Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 5 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/05933/26 San Pawl il-Bahar: Sanctioning of Flat 3 as built due to deviations from PB/05377/85. Deviations consist of shifting of facade apertures, internal shifting of walls and updating…
- PA/07059/26 San Pawl il-Bahar: Proposed change of use from remaining part of garage to garage for public service garage. No changes to front elevation. One private car is being retained.
- PA/06011/26 San Pawl il-Bahar: To propose additional bedroom and bathroom.
- PA/02528/26 San Pawl il-Bahar: To sanction changes to parking layout at level 0 and internal alterations at level 7 and to propose pool at roof level.
- PA/02191/26 San Pawl il-Bahar: Proposed change of use from 1-bedroom duplex apartment at ground floor to a class 4B shop at ground floor and a 1-bedroom apartment at 1st floor. This…
- PA/02074/26 San Pawl il-Bahar: Construction of 1 x 2-bedroom flat and 1 x 1 bedroom penthouse over existing block of flats and variation from the official alignment.
- PA/05154/25 San Pawl il-Bahar: Construction of staircase from receded to roof floor levels and construction of pool and planter at roof level.
- PA/05468/25 San Pawl il-Bahar: Sanctioning of two garages at street level and Sanctioning of garages previously approved as storage space in permit PB434/90. Proposed change of use from 2…
- PA/04654/25 San Pawl il-Bahar: Proposed sanctioning of small extension at first and second floor level to pre-67 dwelling, and proposed raising of party wall in back yard for privacy.
- PA/04826/25 San Pawl il-Bahar: Construction of 1 x 2-bedroom flat and 1 x 1 bedroom penthouse over existing block of flats.
- PA/01924/25 San Pawl il-Bahar: To sanction variations to PA/00333/17 and correction of site.
- PA/00528/25 San Pawl il-Bahar: Renewal of PA/07445/19 - Alterations and additions to existing duplex at 3rd and 4th floor and construction of 1 bedroom duplex at 5th and 6th floor.
- PA/07562/24 San Pawl il-Bahar: To demolish existing apartment block and construct a 7 floor +1 receded unit residential block overlying ground floor garages and excavate a small basement…
- PA/04982/24 San Pawl il-Bahar: To demolish existing staircase and propose construction of new stairs and lift and additional two apartments at fourth and fifth floors and one duplex unit at…
- PA/04697/24 San Pawl il-Bahar: To sanction change of use from Class 4B shop to 1 bedroom residential unit, construction of room in backyard, and other internal and external additions and…
More by Emmanuel Bonello
- PA/06560/26 Rabat: Proposed demolition of existing second floor washroom and proposed construction of 2 bedroom apartment and second floor.
- PA/06523/26 Zebbug: The proposed excavation for the construction of a reservoir and basement level, comprising a basement ancillary store interconnected with a ground floor shop…
- PA/04830/26 Mosta: Proposed extension of existing penthouse into apartment and a proposed new overlying penthouse.
- PA/04755/26 Rabat: Proposed construction of an agricultural store, with pump room, open top reservoir, underground reservoir and access ramp.
- PA/02869/26 Zurrieq: Demolition of the existing garage structures and proposed redevelopment of the site to include new ground-floor garages with two overlying maisonette units…
- PA/01800/26 Qormi: To sanction apartment as built, including internal heights and layout, common area and ground floor bedroom.
All applications by Emmanuel Bonello
More from Antoine Sciberras
- PA/06498/26 Fgura: To sanction garage layout as built from as approved permit PA/3526/97 and proposed change of use from garage to dwelling at Class 1A.
- PA/07585/25 San Gwann: To sanction internal and external alterations from that approved in PAPB2006/86 and to install air-condition units, fascia signs and roller shutter.
- PA/00997/24 Mgarr: Extension to approved (PA/03675/21) basement storage under approved footprint. Proposal also includes slight alterations to the facade.
- PA/07109/23 Lija: Restoration of facade and timber apertures.
- PA/02756/21 Naxxar: Proposed extension at second floor level including addition of lounge and games room, installation of pv panels at roof level and aluminium screening of…