propertylist

PA/05584/25: Demolition of existing dwelling and proposed construction in Zebbug

187, Liberty House, Vjal il-Helsien, Zebbug

Demolition of existing dwelling and proposed construction of a Class 4B retail outlet at ground floor, three apartments and a penthouse at receded floor level. The proposal also includes the reconstruction of the facade as existing with minor alterations, including the formation of a wider aperture at ground floor.

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
187, Liberty House, Vjal il-Helsien, Zebbug
Locality
Zebbug
Applicant
Joe Mizzi
Perit
Perit Samuel Formosa
Application type
Full development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction (Residential)
Residential units
4
Received
30 May 2025
Validated
27 August 2025
Published
27 August 2025
Comments close
26 September 2025
Recommendation
Refuse Permission
Decision
Grant Permission
Decision date
13 January 2026

Premium: register with WhatsApp (free) on PropertyList to read what its planning file says: the case officer's recommendation, the reasons, conditions and consultations.

The public planning file has 30 documents: plans, reports, consultations and the decision.

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 187, Liberty House, Vjal il-Helsien, Zebbug

62 other applications within 300 m: 40 granted, 2 refused, 4 pending. 95% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/03812/24).

On Vjal il-Helsien: 20 other applications, 13 granted and 1 refused; granted buildings are typically 2 floors, the tallest 5. Periti active on this street: Pierre Poulton, Andre Camenzuli, Falzon & Cutajar, Innovative Design Architects (iDA), Christopher Micallef.

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 7 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Samuel Formosa

All applications by Samuel Formosa

All planning applications in Zebbug