propertylist

PA/06057/24: Demolition of existing first and second floor in Rabat

29, Bellaria, Triq Rudolph Saliba, Rabat

Demolition of existing first and second floor levels, alterations at ground floor and construction of two overlying apartments, and washroom at roof level.

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
29, Bellaria, Triq Rudolph Saliba, Rabat
Locality
Rabat
Applicant
Rita Micallef
Perit
Perit Roderick Camilleri
Application type
Full development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction (Residential)
Height
3 floors
Residential units
2
Received
9 July 2024
Validated
11 September 2024
Published
11 September 2024
Comments close
11 October 2024
Recommendation
Grant Permission
Decision
Grant Permission
Decision date
10 July 2025
Permit expires
19 November 2030

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 29, Bellaria, Triq Rudolph Saliba, Rabat

160 other applications within 300 m: 92 granted, 7 refused, 23 pending. 93% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/02758/25).

On Triq Rudolph Saliba: 4 other applications, 1 granted and 0 refused.

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 16 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Roderick Camilleri

All applications by Roderick Camilleri

More from Rita Micallef

All planning applications in Rabat