PA/06550/24: sanction industrial garages as built in Zebbug
Andrea, Triq l-Imdina, Zebbug
To sanction industrial garages as built (Class 5A - light industry, Class 6A - storage and distribution and Class 6B - boatyards).
- Status
- Pending (Awaiting Recommendation)
- Location
- Andrea, Triq l-Imdina, Zebbug
- Locality
- Zebbug
- Applicant
- Paul Demicoli
- Perit
- Perit Edgar Caruana Montaldo
- Application type
- Full development permission
- Zone
- Outside Development Zone
- Type of works
- Sanctioning
- Received
- 3 July 2024
- Validated
- 25 September 2024
- Published
- 25 September 2024
- Comments close
- 25 October 2024
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Andrea, Triq l-Imdina, Zebbug
81 other applications within 300 m: 40 granted, 6 refused, 13 pending. 87% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/02594/25).
On Triq l-Imdina: 78 other applications, 38 granted and 6 refused; granted buildings are typically 5 floors, the tallest 5. Periti active on this street: Colin Zammit, Charles Azzopardi, Krista Xuereb, Keith Schembri, Charles Buhagiar.
Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 14 comparable decisions nearby). Outside the development zone, where approvals are harder. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/01849/23 Zebbug: Renewal application for PA/03645/17 - Construction of sheep farm, including the construction of boundary walls with random stonework and sanctioning of gate.…
- PA/01224/23 Zebbug: Construction of sheep farm.
- PA/05409/26 Zebbug: Proposed relocation of gate, green house, and underlying reservoir.
- PA/02600/26 Zebbug: To propose construction of chicken units, workshop / equipment store, silos, manure clamp, cesspit, packing room, office, and ancillary facilities. Proposal…
- PA/01107/21 Zebbug: To construct reservoir and pump room. Application also includes the construction of a rubble boundary wall and the installation of a timber gate.
- PA/07708/24 Zebbug: Proposed single sided electronic LED billboard.
- PA/01805/23 Zebbug: Removal of existing ready mix plant and construction of warehouses, as already approved in PA/05006/18"
- PA/04021/23 Zebbug: Proposed reservoir and pump room, and reconstruction of rubble wall
- PA/03448/24 Zebbug: To reconstruct collapsed slabs in existing agricultural store.
- PA/08715/24 Zebbug: Maintenance of existing rubble walls, deposit of soil and installation of gate.
- PA/00747/25 Zebbug: The proposal includes rubble wall around the site together with reservoir and pump room.
- PA/02404/21 Zebbug: To construct a rabbit farm with ancillary facilities and to sanction the hard landscaping, a pump room with underlying reservoir
- PA/07529/26 Zebbug: Proposed alteration of volleyball court and adjoining hardstand into two padel courts.
- PA/04717/26 Zebbug: Proposed installation of LPG Tank.
- PA/07423/26 Zebbug: To sanction correction to site boundary wall and pavement alignment approved in PA1292/19 and addition of planter.
More by Edgar Caruana Montaldo
- PA/06562/26 St Julians: Alterations to facade (installation of window).
- PA/03936/26 Zejtun: Renewal to PA10927/17 and PA2444/12 and PA5922/07 - To construct semi-basement garages and overlying apartments and penthouse.
- PA/01089/26 San Pawl il-Bahar: Change of use of part of garage to studio apartment and extension of lift to garage level.
- PA/00589/26 Mosta: To sanction building as built (minor changes to internal layouts and elevation to property covered by PA3187/22 and PA5204/19 - 4 in no. basement garages, 3…
- PA/07704/25 St Julians: Change of use from offices (Class 4A) to golf simulator arcade with ancillary Class 4C facilities. Woks include internal additions and alterations.
- PA/03074/25 Attard: To sanction. Reconstruction of rubble wall and dismantling of room and proposed reinstatement of rubble wall and reconstruction of room