propertylist

PA/06884/24: Demolition of the existing washroom in Zabbar

No.5, Airspace, Triq il-Figel, Zabbar

Demolition of the existing washroom, construction of a second-floor independent dwelling with a gross floor area of 262 sqm to be numbered as (number 2) on overlying airspace, washroom at the receded floor level and staircase and lift to create a vertical connection.

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
No.5, Airspace, Triq il-Figel, Zabbar
Locality
Zabbar
Applicant
Annalise Attard
Perit
Perit Rene Fava
Application type
Full development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction (Residential)
Height
3 floors plus a receded floor
Residential units
1
Received
21 July 2024
Validated
15 January 2025
Published
15 January 2025
Comments close
14 February 2025
Recommendation
Grant Permission
Decision
Grant Permission
Decision date
29 July 2025
Permit expires
20 August 2030

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around No.5, Airspace, Triq il-Figel, Zabbar

69 other applications within 300 m: 48 granted, 2 refused, 8 pending. 96% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/03838/24).

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 10 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Rene Fava

All applications by Rene Fava

All planning applications in Zabbar