PA/07155/26: sanctioning as built and proposed alterations from in Zabbar
Saint Anthony House, Triq Agatha Barbara c/w, Triq Wigi Bongailas, Zabbar
Proposed sanctioning as built and proposed alterations from approved PA/01351/10 and variations from the official building alignment. Proposed demolition of the existing roof structures. Proposed extension at third floor level and proposed receded floor level. Proposal includes introduction of lift from ground floor level. Proposed Class 4A office at ground floor level and proposed sign.
- Status
- Pending (Awaiting Recommendation)
- Location
- Saint Anthony House, Triq Agatha Barbara c/w, Triq Wigi Bongailas, Zabbar
- Locality
- Zabbar
- Applicant
- MNA Property Ltd Attn: Andrew Azzopardi
- Perit
- Perit Joseph Bondin
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- Sanctioning
- Height
- 4 floors plus a receded floor
- Received
- 11 August 2026
- Validated
- 14 October 2026
- Published
- 14 October 2026
- Comments close
- 13 November 2026
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Saint Anthony House, Triq Agatha Barbara c/w, Triq Wigi Bongailas, Zabbar
71 other applications within 300 m: 40 granted, 1 refused, 8 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/06890/25).
On Triq Agatha Barbara: 9 other applications, 5 granted and 0 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: Randolph Nicholas Bartoli, Ruben Sciortino.
Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 18 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/06986/26 Zabbar: To demolish the existing first-floor maisonette and undertake alterations at ground floor level, to construct four apartments at first and second floor…
- PA/00372/26 Zabbar: To sanction size of backyard from that approved in PA2093/21 and roofing/enclosing of back terrace at penthouse level to form drying area.
- PA/02093/21 Zabbar: To sanction changes to internal layout from approved permits PAPB/5273/79 and PA/4123/17, changes to facade and extensions at second/third setback floor…
- PA/01549/25 Zabbar: To demolish existing structures, excavate and to construct 2 basement levels of garages/parking, including 47 overlying apartments. Application also consists…
- PA/01214/22 Zabbar: Internal alterations to existing residence and construction of an additional 4 apartments at first, second and third floor levels. Proposal includes the…
- PA/01038/26 Zabbar: Proposed excavation of site to construct a water reservoir and basement garages, with overlying 2 maisonettes, 9 apartments and 2 receded penthouses.
- PA/00605/20 Zabbar: Proposed change of use from garage to Class 4B shop and construction of W.C, fixing of sign, retractable awning, A.C unit and roller shutter in front of shop…
- PA/03158/21 Zabbar: Proposed change of use from garage to Class 4B Shop, formation of w.c./store at back, and fixing of sign with AC louvered enclosure.
- PA/06490/26 Zabbar: To perform internal alterations to existing dwelling and construct second floor apartment and washroom.
- PA/05818/23 Zabbar: Proposed change in activity within the same commercial class use from Class 4B nail technician shop to Class 4B greengrocer, including changing the shop…
- PA/01149/20 Zabbar: Amend use from Class 4B grocer to Class 4B nail technician, changing sign and internal alterations.
- PA/06421/25 Zabbar: Change of use from garage to maisonette and to sanction extension of basement garage covered by PA (Permit PABA/4038/86).
- PA/03978/25 Zabbar: To sanction changes from PB2750/85 and Internal and external alterations to existing dwelling and addition of 1 apartment at third floor and 1 apartment at…
- PA/04627/24 Zabbar: Proposed alterations at ground floor and construction of 3 overlying apartments and 1 penthouse.
- PA/02188/21 Zabbar: Proposed construction a swimming pool in backyard and to interconnect a private garage with same backyard.
More by Joseph Bondin
- PA/07614/26 St Julians: Proposed changes in layout to approved Class 3B hotel in PA/2151/23, changes include merging of property to existing hotel approved in PA/6725/20. Proposal…
- PA/07580/26 Mosta: Proposed demolition of existing townhouse and change of use from Class 1 residential to construct Class 3A five-storey guesthouse comprising a total of 18…
- PA/07514/26 San Pawl il-Bahar: Proposed change of use at first floor level from Class 4A offices to Class 2C educational institution for foreign students coming over to Malta for…
- PA/07400/26 Ghaxaq: To demolish existing building, to excavate 3 basement levels and construct 5 story apartment building with pools at ground floor and roof level.
- PA/07349/26 Birkirkara: Proposed alterations and correction of site following survey as built for levels which have been approved by planning applications PA/2035/20 and PA/4006/22.…
- PA/07300/26 Qormi: Proposed demolition of existing building, excavation of 3 basement levels for parking and construction of six levels building including showroom Class 4B,…
All applications by Joseph Bondin
More from MNA Property Ltd
- PA/07300/26 Qormi: Proposed demolition of existing building, excavation of 3 basement levels for parking and construction of six levels building including showroom Class 4B,…
- PA/06986/26 Zabbar: To demolish the existing first-floor maisonette and undertake alterations at ground floor level, to construct four apartments at first and second floor…
- PA/06477/26 Mosta: Proposed pool at roof level.
- PA/06378/26 Zabbar: To demolish the existing townhouse and construct a residential building comprising four floors and a total of seven residential units.
- PA/06087/26 Qormi: Part change of use of showroom Class 4B to two shops Class 4D food establishment, one fitness studio Class 3C and creating a common access for the overlaying…
- PA/05759/26 Qormi: Excavation of the site to the required level and construction of Class 6A at basement, ground, first, second and third floors and parking spaces at fourth…