PA/07720/23: Sanctioning to correct approved section and rear in San Pawl il-Bahar
70 Block A, Flat 1, Triq San Publju, San Pawl il-Bahar
Sanctioning to correct approved section and rear façade in PA/5550/09, lowering of sills on rear façade and re-opening of blocked up windows on the façade.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- 70 Block A, Flat 1, Triq San Publju, San Pawl il-Bahar
- Locality
- San Pawl il-Bahar
- Applicant
- Mark Sant
- Perit
- CVC Architecture
- Application type
- Full development permission - Summary Process
- Zone
- Within Development Zone
- Type of works
- Sanctioning
- Residential units
- 1
- Received
- 2 November 2023
- Validated
- 5 March 2024
- Published
- 3 January 2024
- Comments close
- 18 January 2024
- Decision
- Acceptable
- Permit expires
- 20 March 2029
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 70 Block A, Flat 1, Triq San Publju, San Pawl il-Bahar
7 other applications on the same street: 5 granted, 0 refused, 1 pending. 100% of decided applications nearby were granted.
On Triq San Publju: 7 other applications, 5 granted and 0 refused. Periti active on this street: Daniel Grima, CVC Architecture.
Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 2 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/01085/26 San Pawl il-Bahar: To demolish existing penthouse and construct two additional two bedroom apartments and a one bedroom penthouse on top.
- PA/07450/25 San Pawl il-Bahar: To convert washroom to a domestic store at fourth floor level. Sanctioning of drying area at fifth floor level and proposed conversion of the latter to a…
- PA/05893/24 San Pawl il-Bahar: Construction of washroom between two existing structures at roof level including opening of doorway in common parts.
- PA/03651/24 San Pawl il-Bahar: Extension at roof level and alterations at ground and lower roof floor level.
- PA/03128/23 San Pawl il-Bahar: Sanctioning of variations to PA/05584/19 which include minor displacements of internal and external walls, and apertures. Proposed travertine cladding on the…
- PA/00324/21 San Pawl il-Bahar: Proposed triplex dwelling overlying block of apartments.
- PA/07146/26 San Pawl il-Bahar: To construct a 1-bedroom apartment at first floor level.
More by CVC Architecture
- PA/07589/26 Swieqi: To sanction variations from approved permit (PA/03308/25).
- PA/07366/26 Balzan: Change of use from approved office Class 4A to Class 1 dwelling including changes to internal layout.
- PA/06461/26 Kalkara: Internal structure alterations to an existing townhouse, construction of new stairwell and extension at third floor and receded floor at fourth level, to…
- PA/05757/26 Gharghur: To sanction variations to approved permit PA/06682/16 following survey of property and to propose internal alterations and extension at first floor and at…
- PA/05585/26 Mellieha: To sanction changes to approved block of apartments as per PA/06224/18.
- PA/05488/26 Mellieha: Changes to plans and elevations approved in PA/0996/25 including indoor swimming pool at basement level.
All applications by CVC Architecture
More from Mark Sant
- PA/05868/25 Tarxien: Non-structural alterations to subdivide an existing 3rd floor apartment into two.
- PA/05893/24 San Pawl il-Bahar: Construction of washroom between two existing structures at roof level including opening of doorway in common parts.