PA/00476/20: change of use of a shop/showroom class in Zebbug
Pollo Fritto, Triq l-Imdina, Vjal il-Helsien, Zebbug
Proposed change of use of a shop/showroom class 4 approved by PA/1587/08 to Class 4D (use classes order 2014). Proposal also includes minor internal and external changes.
- Status
- Status being checked
- Location
- Pollo Fritto, Triq l-Imdina, Vjal il-Helsien, Zebbug
- Locality
- Zebbug
- Applicant
- Mr Raymond Scerri
- Perit
- Perit Mannie Galea
- Type of works
- Change of Use
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Pollo Fritto, Triq l-Imdina, Vjal il-Helsien, Zebbug
81 other applications within 300 m: 40 granted, 6 refused, 14 pending. 87% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/02594/25).
On Triq l-Imdina: 78 other applications, 38 granted and 6 refused; granted buildings are typically 5 floors, the tallest 5. Periti active on this street: Colin Zammit, Charles Azzopardi, Krista Xuereb, Keith Schembri, Charles Buhagiar.
Approval estimate for change of use applications like this here: about 95% (likely range 65–100%, low reliability, from 2 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/01849/23 Zebbug: Renewal application for PA/03645/17 - Construction of sheep farm, including the construction of boundary walls with random stonework and sanctioning of gate.…
- PA/01224/23 Zebbug: Construction of sheep farm.
- PA/05409/26 Zebbug: Proposed relocation of gate, green house, and underlying reservoir.
- PA/02600/26 Zebbug: To propose construction of chicken units, workshop / equipment store, silos, manure clamp, cesspit, packing room, office, and ancillary facilities. Proposal…
- PA/01107/21 Zebbug: To construct reservoir and pump room. Application also includes the construction of a rubble boundary wall and the installation of a timber gate.
- PA/07708/24 Zebbug: Proposed single sided electronic LED billboard.
- PA/01805/23 Zebbug: Removal of existing ready mix plant and construction of warehouses, as already approved in PA/05006/18"
- PA/04021/23 Zebbug: Proposed reservoir and pump room, and reconstruction of rubble wall
- PA/03448/24 Zebbug: To reconstruct collapsed slabs in existing agricultural store.
- PA/08715/24 Zebbug: Maintenance of existing rubble walls, deposit of soil and installation of gate.
- PA/00747/25 Zebbug: The proposal includes rubble wall around the site together with reservoir and pump room.
- PA/02404/21 Zebbug: To construct a rabbit farm with ancillary facilities and to sanction the hard landscaping, a pump room with underlying reservoir
- PA/06550/24 Zebbug: To sanction industrial garages as built (Class 5A - light industry, Class 6A - storage and distribution and Class 6B - boatyards).
- PA/07529/26 Zebbug: Proposed alteration of volleyball court and adjoining hardstand into two padel courts.
- PA/04717/26 Zebbug: Proposed installation of LPG Tank.
More by Mannie Galea
- PA/07794/26 Naxxar: To excavate and construct a domestic store at basement level over site covered by PA/07034/23.
- PA/07662/26 Marsa: Alterations to a past Class 4B shop. Change of use to a Class 4B convenience shop including fixing of internally illuminated sign and a/c’s
- PA/07522/26 Birkirkara: Sanctioning of internal alterations to a Class 4A office for use of a Class 4B (EMS) - electrical muscle stimulation studio.
- PA/07488/26 Rabat: Sanctioning of an agricultural store.
- PA/07454/26 Birkirkara: Change of use of a garage into a Class 4B salon including alterations, fixing of internally illuminated sign and a/c.
- PA/07356/26 Birkirkara: Renewal to PA/04630/18 - Formation of a shower room and fixing of an internal partition at first floor level. Demolition pf existing third floor penthouse;…
All applications by Mannie Galea
More from Raymond Scerri
- PA/02726/24 Marsa: Alterations and extension to a second floor apartment and overlying washroom including construction of a parapet wall at roof level. Sanctioning of…
- PA/06419/23 Zebbug: Change of use of a Class 4B shop approved as per PA/7155/21 into a Class 4B mini market, fixing of air conditioners and cooling units. Sanctioning of fixing…
- PA/00272/21 Marsa: Proposed sanctioning of differences from previously approved permit PA/03972/91. Proposal also includes construction of a parapet wall at top roof level