PA/02323/22: demolish the existing buildings in Naxxar
St. Mary, Triq ir-Ramla, Maghtab, Naxxar
To demolish the existing buildings, to excavate the site, to construct 6 in number (Class 5B) workshops, ancillary offices and basement garages, and fixing of signs.
- Status
- Status being checked
- Location
- St. Mary, Triq ir-Ramla, Maghtab, Naxxar
- Locality
- Naxxar
- Applicant
- Mr Silvio Felice
- Perit
- Perit Elena Borg Costanzi
- Type of works
- Demolition & New Construction
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around St. Mary, Triq ir-Ramla, Maghtab, Naxxar
34 other applications within 300 m: 11 granted, 2 refused, 5 pending. 85% of decided applications nearby were granted. Tallest granted nearby: 1 floors (PA/04886/24).
On Triq ir-Ramla: 32 other applications, 11 granted and 2 refused; granted buildings are typically 1 floors, the tallest 1. Periti active on this street: Emmanuel k.a. Noel Debattista, Matthew Gauci, Charles Buhagiar, Alistair Avallone, Adrian Mangion.
Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 0 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/00947/23 Naxxar: Proposed dairy farm with the addition of an entrance gate and the raising of the outer (pavement) boundary wall.
- PA/02803/25 Naxxar: Change of husbandry in approved farm from dairy cows (approved in PA/00947/23) to goats/sheep farm. Maintenance of existing boundary rubble walls and new…
- PA/00838/22 Naxxar: Proposed construction of underground reservoir, agricultural store and pump room.
- PA/00308/26 Naxxar: To install new timber gate including restoration of wall and the construction of underground reservoir and a pump room.
- PA/00942/23 Naxxar: Construction of underground reservoir - covered in 0.6 m of soil. The water will be collected off the road rain waters that flow heavily during rain periods.…
- PA/06756/24 Naxxar: To sanction rubble walls, timber gate, site clearance works, and deposition of soil. The proposal also entails the preservation and extension of a pre-1967…
- PA/05662/25 Naxxar: To sanction open storage yard (Class 6A) and the raised rubble walls around the site to match with the adjacent rubble walls.
- PA/03279/25 Naxxar: Proposed excavation and construction of a basement, for garages for recycling trucks.
- PA/00942/24 Naxxar: Proposed external alterations in apertures, changes in landscaping from approved permit PA8252/19, and the proposed demolition and reconstruction of boundary…
- PA/00419/20 Naxxar: To sanction existing structures including part of reinstated boundary (rubble) wall and proposed entrance gates and removable parking shade structure
- PA/01494/21 Naxxar: To sanction the terminal station as built, change in landscaping scheme, addition of security fence and gate, switch room, alterations to facades & buildings…
- PA/06793/24 Naxxar: To sanction pre-1994 agricultural store including reinstatement of dry random rubble wall and installation of timber gate, sanctioning of small reservoir and…
- PA/05756/23 Naxxar: To create a new entrance to the property, to sanction rooms and reservoir on site, to restore rubble walls
- PA/01350/22 Naxxar: Internal and external alterations at ground floor level including construction of pool and proposed extension at first floor level. Proposed excavation at…
- PA/00103/22 Naxxar: Removal of existing site boundary and reconstruction of rubble wall in its original position.
More by Elena Borg Costanzi
- PA/07840/26 Gzira: To sanction studio apartment, common area, and garages at ground floor as built, from that approved in PA/07785/23.
- PA/07721/26 Sliema: To develop existing airspace into 2 apartments and to alter some back areas in the existing house to accommodate a further two apartments, adding up to a…
- PA/07477/26 Sliema: Restoration of facades and non-illuminated sign to Class 4A offices on both streets.
- PA/07292/26 Balzan: Introduction of wall lining (low height) at ground floor and first floor, split level at ground floor and to include a small basement discovered during the…
- PA/07044/26 Pembroke: Demolition of existing dwelling, excavation and construction of basement garages, and overlying four apartments and a penthouse at receded level.
- PA/06795/26 Swieqi: To excavate and construct semi-basement garages, Class 4B retail shop including sign and secondary access to garages approved in PA/02370/16, 8 overlying…
All applications by Elena Borg Costanzi
More from Silvio Felice
- PA/02970/25 Mosta: To excavate basement and construct Class 3A guesthouse with 30 guestrooms throughout 4 levels and at a receded level.
- PA/06026/24 Naxxar: Change of use from workshops (Class 5B) as approved in PA2323/22 to an indoor sports facility (Class 3C) including ancillary uses to the facility such as…
- PA/02267/24 Naxxar: To create olive grove and olive press, proposed replacement of the gate and raising of boundary wall.
- PA/03791/23 San Lawrenz: To construct reservoir for agricultural use, to dismantle existing boundary walls and to construction them in rubble stone.