PA/02327/24: total demolition of existing terraced houses and in San Pawl il-Bahar

Site at, Triq is-Simar/, Telghet ix-Xemxija, Xemxija, San Pawl il-Bahar

Proposed total demolition of existing terraced houses and Class 4B Shop, excavation, and construction of basement garages. Proposed construction of street level garages, 2 retail outlet (Class 4B), 5 levels of apartments with overlying recessed levels at levels 6-8 that overlook Triq Telghet ix-Xemxija. Also, proposed 6 levels of apartments with recessed floor level at level 10 that overlook Triq is-Simar.

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
Site at, Triq is-Simar/, Telghet ix-Xemxija, Xemxija, San Pawl il-Bahar
Locality
San Pawl il-Bahar
Applicant
James Zammit
Perit
Perit Joseph Bondin
Application type
Full development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction (Residential)
Height
6 floors plus a receded floor
Received
11 December 2023
Validated
12 June 2024
Published
12 June 2024
Comments close
12 July 2024
Recommendation
Refuse Permission
Decision
Grant Permission
Decision date
18 February 2025
Permit expires
16 April 2030

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Site at, Triq is-Simar/, Telghet ix-Xemxija, Xemxija, San Pawl il-Bahar

83 other applications within 300 m: 47 granted, 1 refused, 4 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 6 floors (PA/01127/24).

On Triq is-Simar: 12 other applications, 6 granted and 0 refused; granted buildings are typically 6 floors, the tallest 6. Periti active on this street: Bezzina & Cole Architects & Engineers, Charles Buhagiar.

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 4 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.