propertylist

PA/03546/21: Construction of electric car charging stations in Luqa

Site at (Field), Triq Hal Qormi, Luqa

Construction of electric car charging stations, including ancillary facilities

Status
Status being checked
Location
Site at (Field), Triq Hal Qormi, Luqa
Locality
Luqa
Applicant
Sanjay Wilson
Perit
Dr Robert Musumeci LL.D., Perit
Type of works
New Construction

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Site at (Field), Triq Hal Qormi, Luqa

33 other applications within 300 m: 18 granted, 0 refused, 5 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/04108/23).

On Triq Hal Qormi: 13 other applications, 8 granted and 0 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: Claire Bezzina.

Approval estimate for new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 3 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Robert Musumeci LL.D., Perit

All applications by Robert Musumeci LL.D., Perit

All planning applications in Luqa