propertylist

PA/04575/25: demolition of first floor level in St Julians

141, Triq San Gorg c/w, Triq Francis Zammit, San Giljan

Proposed demolition of first floor level, alterations at ground floor level and construction of hotel (Class 3B) from ground floor upwards to include 32 accommodation rooms. Proposal includes construction of pool at 10th floor recessed level.

Status
Granted (Planning Authority decision reviewed by Appeals Board / EPRT)
Location
141, Triq San Gorg c/w, Triq Francis Zammit, San Giljan
Locality
St Julians
Applicant
Joseph Portelli
Perit
Perit Maria Schembri Grima
Application type
Full development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction
Height
11 floors
Received
25 March 2025
Validated
9 July 2025
Published
9 July 2025
Comments close
25 August 2025
Recommendation
Grant Permission
Decision
Grant Permission
Decision date
13 January 2026
Permit expires
18 March 2031

Premium: register with WhatsApp (free) on PropertyList to read what its planning file says: the case officer's recommendation, the reasons, conditions and consultations.

The public planning file has 95 documents: plans, reports, consultations and the decision.

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 141, Triq San Gorg c/w, Triq Francis Zammit, San Giljan

78 other applications on the same street: 52 granted, 2 refused, 7 pending. 96% of decided applications nearby were granted. Tallest granted nearby: 10 floors (PA/01380/25).

On Triq San Gorg: 78 other applications, 52 granted and 2 refused; granted buildings are typically 7 floors, the tallest 10. Periti active on this street: David Vassallo, Colin Zammit, Christian Spiteri, Elena Borg Costanzi, Paul Camilleri.

Approval estimate for demolition & new construction applications like this here: about 77% (likely range 47–100%, low reliability, from 5 comparable decisions nearby). It proposes 11 floors; the tallest granted nearby is 10. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Maria Schembri Grima

All applications by Maria Schembri Grima

More from Joseph Portelli

All planning applications in St Julians