Perit Mario Ellul
10 planning applications since 22 November 2022: 6 granted, 0 refused, 0 pending. Main localities: Siggiewi (2), San Pawl il-Bahar (1), Rabat (1), Qrendi (1), Mosta (1), Mellieha (1).
- PA/05806/24 Birzebbuga: Reconstruction, extension and improvement of existing concrete footpath along the coast for better access to the rocky coast and to the public pathway around…
- PA/05472/24 Qrendi: Refurbishment works at the quay of Wied iz-Zurrieq and surrounding areas. Redevelopment of ticket booth for Blue Grotto operators. Construction of public…
- PA/02780/24 Marsaskala: Excavation and construction of a silt pit for the temporary deposition of liquid silt during the cleaning operations of Zabbar stormwater tunnel. Works entail…
- PA/07297/23 Marsa: Construction of an electricity substation, main electrical switch room and backup generator for the new sports complex Class 3C approved in PA5600/19.
- PA/05662/23 Siggiewi: To repair part of the deteriorated concrete wall and extend the same wall to provide better shelter to the slipway.
- PA/00779/23 Mellieha: Demolishing of existing concrete stairs and construction of an access for all ramp to pre-1968 boathouses.
- PA/03156/22 Siggiewi: Coastal protection works at Ghar Lapsi (East Cove) consisting in the shifting of rock boulders from quay and seabed to protect the toe of the cliff to reduce…
- PA/01342/22 San Pawl il-Bahar: The construction of a rock revetment along the existing friable cliff face to protect it from further coastal erosion and avoid the collapse of Triq Stella…
- PA/00475/22 Rabat: Demolition of aluminum structures and existing store, and construction of a new w.c/kitchenette, and paving of open space adjacent to chapel parvis.
- PA/00043/22 Mosta: Proposed underground stormwater tunnel linking to existing NFRP tunnel infrastructure in Triq il- Belt Valletta with branches to Triq il-Manwella, Triq…