propertylist

PA/01342/22: construction of a rock revetment along the in San Pawl il-Bahar

Foreshore at Ghar tal-Vecca, Triq Stella Maris c/w, Trejqet il-Vecca, San Pawl il-Bahar

The construction of a rock revetment along the existing friable cliff face to protect it from further coastal erosion and avoid the collapse of Triq Stella Maris and damage to adjacent properties including the resurfacing of the existing paved area and small carpark at the end of Trejqet il-Vecca and demolishing of a dangerous concrete and abandoned cesspit along the coast in Triq Stella Maris.

Status
Status being checked
Location
Foreshore at Ghar tal-Vecca, Triq Stella Maris c/w, Trejqet il-Vecca, San Pawl il-Bahar
Locality
San Pawl il-Bahar
Applicant
Perit Stephen Bonello obo Public Works Department
Perit
Perit Mario Ellul
Type of works
New Construction

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Foreshore at Ghar tal-Vecca, Triq Stella Maris c/w, Trejqet il-Vecca, San Pawl il-Bahar

77 other applications within 300 m: 49 granted, 2 refused, 11 pending. 96% of decided applications nearby were granted. Tallest granted nearby: 7 floors (PA/02674/25).

On Triq Stella Maris: 5 other applications, 3 granted and 0 refused.

Approval estimate for new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 6 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Mario Ellul

All applications by Mario Ellul

More from Public Works Department

All planning applications in San Pawl il-Bahar