PA/03156/22: Coastal protection works at Ghar Lapsi in Siggiewi
Ghar Lapsi, Ghar Lapsi, Siggiewi
Coastal protection works at Ghar Lapsi (East Cove) consisting in the shifting of rock boulders from quay and seabed to protect the toe of the cliff to reduce rate of erosion and further collapse (as already happened in 2016) by wave action. Works also entail the repair of the existing damaged concrete platform adjacent to existing slipway for public use.
- Status
- Status being checked
- Location
- Ghar Lapsi, Ghar Lapsi, Siggiewi
- Locality
- Siggiewi
- Applicant
- Perit Stephen Bonello obo Public Works Department
- Perit
- Perit Mario Ellul
- Type of works
- Other
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Ghar Lapsi, Ghar Lapsi, Siggiewi
No other applications recorded nearby yet.
Approval estimate for other applications like this here: about 95% (likely range 65–100%, low reliability, from 0 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
More by Mario Ellul
- PA/05806/24 Birzebbuga: Reconstruction, extension and improvement of existing concrete footpath along the coast for better access to the rocky coast and to the public pathway around…
- PA/05472/24 Qrendi: Refurbishment works at the quay of Wied iz-Zurrieq and surrounding areas. Redevelopment of ticket booth for Blue Grotto operators. Construction of public…
- PA/02780/24 Marsaskala: Excavation and construction of a silt pit for the temporary deposition of liquid silt during the cleaning operations of Zabbar stormwater tunnel. Works entail…
- PA/07297/23 Marsa: Construction of an electricity substation, main electrical switch room and backup generator for the new sports complex Class 3C approved in PA5600/19.
- PA/05662/23 Siggiewi: To repair part of the deteriorated concrete wall and extend the same wall to provide better shelter to the slipway.
- PA/00779/23 Mellieha: Demolishing of existing concrete stairs and construction of an access for all ramp to pre-1968 boathouses.
All applications by Mario Ellul
More from Public Works Department
- PA/07232/26 Birkirkara: Stormwater relief tunnel to relieve flooding problems near Triq San Giljan.
- PA/05806/24 Birzebbuga: Reconstruction, extension and improvement of existing concrete footpath along the coast for better access to the rocky coast and to the public pathway around…
- PA/02780/24 Marsaskala: Excavation and construction of a silt pit for the temporary deposition of liquid silt during the cleaning operations of Zabbar stormwater tunnel. Works entail…
- PA/00779/23 Mellieha: Demolishing of existing concrete stairs and construction of an access for all ramp to pre-1968 boathouses.
- PA/01342/22 San Pawl il-Bahar: The construction of a rock revetment along the existing friable cliff face to protect it from further coastal erosion and avoid the collapse of Triq Stella…
- PA/03256/21 Mqabba: To sanction changes to PA/03759/18 including conversion from reservoir to soak away and inclusion of ventilation/ access opening. The proposal shall also…